Based on an average demand of 20.0 kWh/day (~600 units/month at ₹7.5/unit), a 5.0 kW solar array (10 × 545Wp modules) will offset your energy consumption. A grid-tied system syncs directly with the utility grid via Net Metering and requires no battery storage.
*Solar sizing assumes 4.5 peak sun hours, 78% Performance Ratio (PR), and 545Wp modules. Battery sizing applies an 80% maximum Depth of Discharge (DoD) limit so batteries are never drained past 20% reserve.
ENGINEERING METHODOLOGY
How We Calculate Your Solar PV & LiFePO4 Battery Size
Accurate solar system design accounts for real-world thermal derating, inverter efficiency, Depth of Discharge (DoD) limits, and Indian utility phase rules.
1. Daily kWh & 78% Performance Ratio (PR)
We convert your monthly electricity bill or unit consumption into daily energy demand (kWh/day) and divide by 4.5 regional peak sun hours multiplied by a conservative 0.78 Performance Ratio (PR). This accounts for tropical cell temperature losses, DC cable resistance, and MPPT inverter conversion efficiency across India.
For Smart Hybrid and Off-Grid systems, draining a lithium iron phosphate (LiFePO4) battery to 0% shortens cycle life and leaves no emergency reserve. Our sizing formula enforces an 80% maximum Depth of Discharge (DoD) so your 51.2V battery bank retains a 20% safety buffer while powering your connected load.
Battery Bank (kWh) = (Load kW × Backup Hours) ÷ 0.80 DoD
3. Module Wattage & 1-Phase vs. 3-Phase
Upgrading from 450Wp Mono PERC to high-density 545Wp–600Wp N-Type TOPCon or HJT solar panels reduces module count and structural mounting cost while shrinking required shadow-free roof space (~35 sq.ft per panel). Systems up to 3.0 kW typically run on Single-Phase (230V), while capacities above 3.0 kW are recommended for Three-Phase (415V) distribution.
Panel Count = ⌈(System kW × 1000) ÷ Panel Wp⌉
Choosing a selection results in a full page refresh.